Job scheduling for Epicor Kinetic

Move the job. See the load first.

An interactive scheduling board on your Epicor jobs: see what each work centre is loaded with, week by week, drag work to another week, check capacity and due dates before you commit, then send the approved move back to Epicor’s schedule.

Read-only boards never change your Epicor data. Only the moves you approve go back.

Try it: example board

Move a job. Watch the load.

Drag a job card to another week, or tap a card and use the buttons. With a keyboard, focus a card and press the left or right arrow. The bars show each work centre’s hours against its capacity.

Schedule board Example data
Within capacityOver capacityWould be late

Scroll sideways to see all four weeks.

Each job card is a button. Press the left or right arrow key to move the job one week. Press Enter to select it.

Select a job to move it.

Sound familiar?

The schedule shouldn’t live on a whiteboard.

  • “The real schedule is on the whiteboard.”

    Epicor says one thing, the whiteboard says another, and the planner keeps both in their head.

  • “We find out a week is overloaded when it’s already late.”

    Nobody sees the pile-up at a work centre until jobs start slipping.

  • “Which jobs are short of material?”

    Someone builds the list by hand every morning, and checks each PO.

What you get

One board on your Epicor jobs.

Scheduling and shop boards that read your Epicor jobs, operations and purchase orders, so the plan and the system agree.

The load, week by week

One screen that shows what each work centre is loaded with, from your Epicor jobs and operations.

Try the move before you commit

Drag work to another week and see the effect on capacity and due dates first.

Warnings before a job goes late

The board warns you when a move overloads a week or puts a job past its due date.

Epicor stays the system of record

Approved moves go back to Epicor’s schedule, so Epicor and the board agree.

Material status on the card

See which jobs are short of material, and whether the open PO arrives in time.

Late POs by supplier

Late purchase orders grouped by supplier, so buyers know who to call first.

Shop floor TV boards

What’s late, what’s next. On the TV.

A TV on the shop floor that always shows what’s late, what’s due today and this week, what’s short of material and which machine groups are behind, straight from Epicor, with the time of the last read. The TV opens a link; no Epicor sign-in or licence is tied up on it.

  • Shop load

    Hours per machine group per week against capacity.

  • Jobs short of material

    Released jobs that are short, and whether the PO lands in time.

  • Late purchase orders

    Late PO lines, grouped by supplier.

  • Stalled jobs

    Jobs that haven’t moved, so someone asks why.

  • Clear to start

    Jobs with everything they need, and what to order now.

  • Morning email

    The same picture in your inbox before the day starts.

How an engagement runs

Scope, build, go live, support.

Senior-led, with specialists added as the scope requires. You see it working on your own data before anything goes live.

  1. Scope

    We look at your work centres, capacity and how you plan today, and agree which boards come first.

  2. Build in your test copy

    The boards read your Epicor test copy, and your planners try real moves there before anything changes in production.

  3. Go live

    Read-only boards go live first. Sending moves back to Epicor is switched on when your planners are ready.

  4. Support

    We stay on call for new work centres, new boards and Kinetic updates.

Questions

Fair questions.

Something else on your mind? Ask us or call 905-483-7424.

Does this replace scheduling in Epicor?

No. Epicor stays the system of record. The board shows your Epicor jobs and lets planners try moves; the moves they approve go back to Epicor’s schedule.

Does it change anything in Epicor?

Only a schedule move that a planner approves and sends. Every other board only reads your Epicor data. Sending moves can stay switched off until you are ready.

Will it warn us before a move makes a job late?

Yes. Before you commit, the board warns you when a move puts a week over capacity or puts a job past its due date.

Can we show it on a TV on the shop floor?

Yes. A shop TV opens a link that shows late jobs, what is due today and this week, what is short and which machine groups are behind. No Epicor sign-in is needed on the TV.

How current is the information?

Boards refresh while they are open and always show the time of the last read from Epicor.

Does it show material shortages?

Yes. It shows which released jobs are short of material and whether the open purchase order arrives in time.

Talk to us

Want the schedule off the whiteboard?

Tell us how you plan today. We’ll reply with how a board on your Epicor jobs would look.