Epicor notes from the field.

Short reads on the problems that actually sink Epicor projects, written from inside implementations, not from a marketing calendar.

Field notes

Six things we see on Epicor Kinetic projects.

They run from go-live readiness to the engineering handoff. Each one links to the review or checklist that goes with it.

01Implementation

Why Epicor implementations fail before go-live

Most failures are not software failures. They come from unclear ownership, weak testing, missing data and processes that aren’t ready. All of it is fixable months before cutover, if someone is watching for it.

02Planning

MRP setup that actually plans

MRP output is only as good as the part settings, lead times, buyers, methods, warehouses and demand signals. Bad parameters produce suggestions nobody trusts, and then nobody uses MRP at all.

03Shop floor

MES labour reporting, explained

Useful labour data depends on how you structure employees, resource groups, job labour, indirect codes and corrections. Get the structure wrong and payroll visibility goes with it.

Epicor Kinetic Close Period Entry with the Main Book and fiscal year 2022
Close Period Entry: a month-end close to test before go-live.

04Finance

Finance testing in Kinetic

AP, AR, GL, bank reconciliation, job costing, cost of sales and month-end close need testing with real scenarios before go-live. Reconciling after cutover is far more work.

BPM Event in the flowa save, a status change Rule runsreacts to that event
Function Called on purposefrom a BPM, screen or integration Reusable logicone place to test and upgrade

05Technical

BPMs or Epicor Functions?

BPMs react to events in the flow. Functions are callable, reusable logic. Choosing the wrong one creates automation that is hard to test, hard to upgrade and hard to hand over.

SolidWorksthe design CADLinkthe handoff Kineticmethod and BOM

Retyping the step where costing errors start

06Engineering

Connecting CAD to Kinetic

ETO shops win or lose on the engineering handoff. Automating method and BOM creation from SolidWorks through CADLink removes the retyping step where most costing errors start.